Deployment

Firstly drop the required amount of pallets along the deployment line;

  • There are seven systems on each pallet
  • To start the deployment simply pull off the packaging and pull a flat pack system (250mm) from the pallet
  • Then fully expand the concertina design out to its maximum length of 4.5m
  • Next, take another system from the pallet, expand it out to its maximum length and butt it up against the first system
  • Carefully insert four spax or drywall screws through the inverted u-frame in the last cell of one system right through to the u-frame in the first cell of the next system
  • When you achieve an efficient joint, continue on this process until you have completed your defence line